Quality Management

Defects Found Too Late Cost You
10x More

QA finds issues too late. Rework costs are exploding. Customer complaints keep rising. The cascade has already started.

The Cost of Late Detection

A defect caught in design costs $1. In production? $100. In the field? $10,000.

68%
Defects found post-production
3.2 days
Avg. time to root cause
$1.8M
Annual rework costs
+34%
Customer complaints YoY

Defect Discovery by Stage

Design
Dev
Test
Prod
Field
$1
$10
$100
$1K
$10K

The Quality Visibility Gap

What You're Tracking:
  • Final inspection pass rates
  • Customer complaint counts
  • Warranty claim totals
  • Scrap percentages
  • Rework hours logged
  • CAPA status updates
  • Audit findings
What You're Missing:
  • Leading indicators by process
  • Defect escape velocity trends
  • Cost of quality by product line
  • Supplier quality correlations
  • Process capability drift
  • Root cause pattern analysis
  • Predictive failure signals

SlideStrike Speaks Quality

45+ quality metrics, automatically visualized.

First Pass Yield
Right first time
DPPM
Defects per million
Cost of Quality
Prevention vs failure
CAPA Age
Open corrective actions
Escape Rate
Missed by inspection
Supplier PPM
Incoming quality
Process Cpk
Capability index
NCR Trends
Non-conformance rate

Questions from Quality Leaders

What Directors of Quality ask

CATCH DEFECTS EARLIER

Quality Insights in 60 Seconds

See the cascade before it starts. Catch issues at design, not in the field.

Connects to QMS, MES, ERP systems
Defect trend analysis by stage
Cost of quality breakdown
Predictive quality alerts
Start Free Trial
Your competitors catch defects at design. You catch them at the customer. Time to shift left.