Manufacturing

Line 3 is Idle While Line 7 is
Bottlenecked

Some lines idle, others bottlenecked. Scheduling is a nightmare. Capacity planning is guesswork. Sound familiar?

The Capacity Balancing Act

You have capacity. You have demand. But they never seem to align.

67%
Avg. line utilization
18 hrs
Weekly scheduling time
$3.2M
Lost capacity annually
4
Chronic bottleneck lines

Line Utilization Comparison

Line 1
85%
Line 2
72%
Line 3
34%
Line 4
91%
Line 5
58%
Line 6
76%
Line 7
98%
Target: 80-85% utilization

The Scheduling Reality

How You Schedule Now:
  • Spreadsheets updated weekly
  • Tribal knowledge from shift leads
  • React to bottlenecks after they form
  • Overtime as the default solution
  • Customer promises drive everything
  • Maintenance scheduled 'when possible'
  • Capacity = gut feeling
What You Need to See:
  • Real-time utilization by line
  • Bottleneck prediction 72 hrs ahead
  • OEE breakdown by shift
  • Changeover impact analysis
  • Demand vs capacity alignment
  • Labor loading by cell
  • What-if scenario modeling

SlideStrike Speaks Manufacturing

50+ manufacturing metrics, automatically visualized.

OEE
Overall equipment effectiveness
Utilization
Actual vs available time
Throughput
Units per hour
Cycle Time
Part to part timing
Changeover
Setup time tracking
Downtime
Unplanned stops
Yield
Good parts ratio
Takt Time
Customer demand rate

Questions from Manufacturing Leaders

What VPs of Manufacturing ask

SOLVE THE CAPACITY PUZZLE

Capacity Visibility in 60 Seconds

See all your lines, utilization, and bottlenecks in one executive-ready view.

Connects to MES, ERP, SCADA systems
Real-time utilization dashboards
Bottleneck prediction alerts
What-if capacity modeling
Start Free Trial
Your competitors optimize capacity with data. You optimize with overtime. Time to balance the equation.