Battery Energy Storage
Your BESS Shows 100% Availability
Usable Capacity is Down 8.3%
OEMs guarantee 80% capacity at year 10. But your degradation curve is steeper than the warranty model. Are you tracking cycle depth, temperature exposure, and state of health?
The Hidden Capacity Crisis
Battery degradation doesn't show up in availability metrics. By the time you notice revenue decline, you've already lost millions in capacity value.
8.3%
Hidden capacity loss
200 MWh
Nameplate at COD
183 MWh
Actual usable today
$4.2M
Revenue at risk
What Your Reports Miss
Hidden Degradation Factors:
- Deep cycling beyond 80% DoD
- Temperature excursions above 35C
- High C-rate dispatch events
- Auxiliary power consumption
- Cell imbalance accumulation
- Calendar aging vs cycle aging
- Warranty curve deviation
What Investors Need to See:
- State of Health (SoH) trending
- Capacity vs warranty guarantee curve
- Revenue impact of degradation
- Augmentation timing forecast
- Thermal management effectiveness
- Dispatch strategy optimization
- Remaining economic life
SlideStrike Speaks Battery Storage
40+ BESS metrics, automatically calculated from BMS and SCADA data.
State of Health
Current vs nameplate
Round-Trip Efficiency
Charge/discharge losses
Cycle Count
Equivalent full cycles
Depth of Discharge
Avg cycle depth
Thermal Events
Temperature excursions
Augmentation Date
Capacity top-up forecast
Revenue/MWh
Dispatch optimization
Warranty Position
Actual vs guaranteed
Questions from BESS Asset Managers
What infrastructure investors and operators ask
EXPOSE THE DEGRADATION BLIND SPOT
True Capacity Visibility in 60 Seconds
Know your real State of Health. Optimize dispatch. Protect your investment.
Connects to Fluence, Tesla, BYD BMS
40+ BESS metrics built in
Warranty curve tracking
Augmentation forecasting